Resources
The Enventure Technical Library is your single source for everything you want to know about solid expandable technology. We have hundreds of documents available for download, including: Articles detailing real-world applications, Case histories depicting real results, Technical papers, and Data sheets.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Tag
Showing 0 of 100
Successful 12¼ in. SameDrift® System Installation Demonstrates Advancement in Expandable Technology
Date Published:
October 31, 2020
Case Study
ESET™ Expandable Liner Enables Planned Completion in the Permian Basin 2
Date Published:
August 25, 2020
Case Study
ESET™ Expandable Liner Enables Planned Completion in Vietnam
Date Published:
August 25, 2019
Case Study
ESET™ Expandable Liner Enables Planned Drilling Operations; Saves 25 Days of NPT
Date Published:
January 1, 2018
Case Study
ESET™ High Performance Open Hole Liner Enables Planned Drilling Operations
Date Published:
June 1, 2017
Case Study
ESET™ High Performance (HP) System Enables Maximum Size Completion
Date Published:
July 1, 2015
Case Study
8-5/8” ESET™ Liner extends 10- 3/4” MLT liner, saves hole section and allows for planned solution in reservoir
Date Published:
March 1, 2017
Case Study
ESET™ Expandable Liner Enables Planned Completion in the Permian Basin
Date Published:
July 1, 2019
Case Study
11 3/4 SET® OPENHOLE LINERS PROVIDE SIMPLE, EFFECTIVE HOLE ISOLATION FOR AN OFFSHORE, PLATFORM BASED, BATCH DRILLING CAMPAIGN IN THE MIDDLE EAST
Date Published:
February 1, 2021
Case Study
ESEAL™ LINER RESTORES WELLBORE INTEGRITY IN CANADIAN GAS PLANT WELL; SAVES REPLACEMENT WELL COSTS
Date Published:
March 23, 2021
Case Study
NEWLY DESIGNED ESEAL™ REFRAC LINER WITHSTANDS EXTREME PRESSURES; RESTORING WELLBORE INTEGRITY
Date Published:
March 23, 2021
Case Study
ESEAL™ HIGH-PERFORMANCE LINER RESTORES WELLBORE INTEGRITY; MAXIMIZING RECOVERABLE RESERVES
Date Published:
May 21, 2021
Case Study
NESTED ESET™ EXPANDABLE LINERS ENABLE PLANNED COMPLETION IN THE GULF OF MEXICO
Date Published:
January 19, 2022
Case Study
ESEAL™ HIGH-PERFORMANCE LINERS RESTORE WELLBORE INTEGRITY IN THE EAGLEFORD BASIN
Date Published:
August 1, 2021
Case Study